Monumental Monument February 23rd, 2018

Santa Maria Monument, City of Santa Maria, CA

The City of Santa Maria consulted with Wallace Group to prepare conceptual design and construction drawings for a new Santa Maria Monument located on the North Broadway southbound US-101 off ramp. Wallace Group teamed together with Pierre Rademaker Design to prepare preliminary sketches, construction section details and construction cost estimates for City review, selection and City Council approval. Once the preferred alternative was approved, the team developed construction documents for implementation.

 Wallace Group provided project management services, Caltrans coordination and encroachment permit assistance, grading, monument sign structural design, subconsultant coordination, construction cost engineers estimate and preparation of the final construction documents for City submittal to Caltrans. Additional amenities include placing the sign on the existing slope with a contoured graded bench and providing solar LED uplighting for nighttime illumination.

See a quick video at



Santa Maria Monument